Shrinkage calculator
Add up the time your agents are paid but not available, and see how many people you actually have to schedule to keep the number you need on the queue.
Total shrinkage
28.0%
72.0% of paid time is productive
Headcount to schedule
56
16 more than the 40 needed on the queue
In-office
13.0%
Out-of-office
15.0%
What shrinkage is
Shrinkage is the share of paid time during which an agent is not available to handle contacts. Staffing models such as Erlang C tell you how many agents you need on the queue. Shrinkage tells you how many more people you must schedule, because some of the paid hours go to breaks, meetings, training, leave and absence.
Planners usually split it in two. In-office shrinkage is time at work but off the queue: breaks and meals that are not already in the schedule, team meetings, training, coaching, system downtime. Out-of-office shrinkage is time away from work: annual leave, sick leave, unplanned absence and lateness, and public holidays.
The formula
Enter each component as a percentage of paid time. The calculator adds them, then divides the agents you need on the queue by the share of time that is productive, and rounds up to a whole person.
Shrinkage % = (paid hours - available hours) / paid hours x 100
Total shrinkage % = sum of every component, each as a % of paid time
Headcount to schedule = agents needed on the queue / (1 - total shrinkage)Worked example
Take the default numbers: breaks 5%, meetings 2%, training 3%, coaching 2%, system downtime 1% (13% in-office) and annual leave 8%, sick leave 3%, unplanned absence 4% (15% out-of-office). Total shrinkage is 28%, so 72% of paid time is productive.
If the Erlang C result says 40 agents must be on the queue at the same time, you schedule 40 / 0.72 = 55.6, which rounds up to 56 people. That is 16 more than the number on the queue. A planner who forgets shrinkage staffs 40 and finds the queue running with around 29 people.
Planned and unplanned shrinkage
Be careful not to count the same time twice. If your schedule already contains breaks and meals as scheduled activities, they are not shrinkage on top of the schedule; they are part of the shift. In that case the shrinkage you apply is only the unplanned loss, such as absence and system issues, plus planned items that sit outside the schedule, such as leave. Decide where each item lives and keep one rule.
It also helps to separate what you can plan from what you cannot. Leave, training and meetings can be scheduled into quiet intervals. Sickness and lateness cannot, so they are the part to cover with buffer and flexibility.
Common mistakes
- Using one yearly percentage for every day. Leave peaks around holidays and training blocks; look at shrinkage by week.
- Adding shrinkage percentages that were measured against different bases, such as a percentage of shifts for one item and of hours for another.
- Including breaks that are already scheduled, which counts them twice.
- Subtracting shrinkage from agents, instead of dividing. Needing 40 agents at 28% shrinkage is 40 / 0.72, not 40 x 1.28.
- Ignoring the difference between a team that works seven days and one that works five when converting leave days into a percentage.
How to measure your own shrinkage
Start from paid hours for a period, usually a week or a month, and subtract the hours agents were actually available to take contacts. Your time clock and agent status data show most of it: time in a break or meeting status, time in training or coaching, time logged out while on shift, and approved leave. Divide each lost category by paid hours and you have the components to enter above.
Do this per team and per month for a while before you trust a single number. New teams carry more training time, teams on night shifts see different absence patterns, and the months around public holidays look nothing like a quiet month. When your measured figure differs from the planning figure, the planning figure is the one to change, because a plan built on a hopeful number leaves the queue short.
Typical ranges to check against your own operation
Total shrinkage in contact centers is commonly discussed in the range of about 25% to 35%, with lower numbers in tightly run operations and higher numbers where leave, training and attrition are heavy. Treat that as a typical range, verify it for your operation, and measure your own for at least a few months before planning on it. Public holidays vary by country, so a Philippine site and a US site will not look alike.

